28 Марта 2024 | четверг | 16:19
Energoterra

In 2009 TGC-2 facilities generated 9,4 bln. KWh of power and 19,4 m GCal of heat

Февраля 04, 2010

The facilities of TGC-2 in 2009 generated 9 386,9 mln. KWh of power, which is 10,9% low than the amount in 2008. At the same time useful output constituted 7 952, 6 mln. KWh, which is low the results of the previous year by 11,7%.

In 2009 the output of TGC-2 facilities from collectors constituted 19 434,1 ths. GCal of heat in comparison to 19 993 ths. GCal in the year 2008. Useful output of heat in 2009 was 17 522,2 ths. GCal in comparison to 17 979,1 ths. GCal of 2008 year.

The power and heat generation 2009 - regional indicators

Arkhangelsk generation - 3 846, 5 mln. KWh и 5 414,7 ths. GCal;
Vologda generation - 167, 5 mln. KWh и 937,7 ths. GCal;
Kostroma generation - 1 014, 7 mln. KWh и 1 861,3 ths. GCal;
Novgorod generation - 540, 2 mln. KWh и 947,9 ths. GCal;
Tver region - 1 372, 5 mln. KWh и 3 290,6 ths. GCal;
Yaroslavl generation - 2 445, 5 mln. KWh и 5 070,0 ths. GCal;

Company Profile
Public JSC Territorial Generation Company-2 (TGC-2) was established on February, 2005. The General Director is Valentin Bragin.
TGC-2 comprises generating capacities of 6 regions - Arkhangelsk, Vologda, Kostroma, Novgorod, Tver and Yaroslavl. TGC-2 operates 16 heat CHPPs, 11 boiler-houses, 5 enterprises of heat pipelines. The aggregate installed electric capacity of TGC-2 enterprises is 2 576,5 MW, the aggregate installed thermal capacity constitutes 12 770,07 Gcal/h.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine