20 Августа 2017 | воскресенье | 10:50
Energoterra

Новости

Августа 17, 2017
Belorusneft began oil production in Ecuador
After Venezuela, Ecuador became the second Latin American country where "Belorusneft" started oil production. This is the Armadillo field on Block 55. The work is carried out in accordance with the contract with the state oil company of Ecuador – Petroamazonas.
Августа 15, 2017
BP begins production from Juniper project in Trinidad
Juniper is the fifth BP Upstream major project, and second in Trinidad, to start-up in 2017.
Августа 09, 2017
Gazprom Neft successfully completes RUB15 billion placement of exchange-traded bonds, with record low coupon rate
Gazprom Neft has successfully completed the placement of its series 001P-02R exchange-traded bonds, with a nominal value of RUB15 billion, and a maturity of seven years. The coupon rate is set at 8.25% per annum, and the coupon period at six months.

Аналитика

Июня 15, 2017
DNV GL invites wind industry to Joint Industry Project to optimize wind farm operations
Hamburg, Germany – 15 June 2017, DNV GL announces its latest Joint Industry Project (JIP), aiming to optimize the performance of wind farms by reducing the downtime and lower the costs of energy during the operational project life span of 25 years or more.
Июня 08, 2017
The two-millionth ton of oil accepted into the CPC system from Russian fields on the Caspian Sea shelf
On June 8, 2017, the two-millionth ton of oil was accepted from Lukoil at the Komsomolsk pump station of Caspian Pipeline Consortium (CPC) in the Republic of Kalmykia into the CPC system. Since the beginning of 2017, Lukoil has delivered about 1.3 million tons of oil into the CPC system.
Мая 24, 2017
INNOVATION A KEY FACTOR FOR DEVELOPMENT IN AFRICA
The Association’s annual conference is dedicated entirely to Mediterranean and sub-Saharan Africa this year. There is a need for innovative business models to create growth opportunities.

Интервью

00, 0000
The route of oil
Currently, main challenges of Transneft JSC include such tasks as integrated improvement of the system of main oil and product pipelines to meet the requirements of oil production and treatment and to ensure effective oil transportation both domestically and abroad; establishment of the infrastructural basis for a flexible and competitive market of oil and oil products; organization of new ways for oil reception. At EnergyLand’s request, the Vice-President of Transneft JSC Mikhail Barkov is telling about the company’s projects.
00, 0000
Electric vehicles conquer Europe
Phil Dingle, head of Eaton Power Utilities and Networks, shared his views on the prospects of the infrastructure for electric vehicles with the EnergyLand.info magazine. Eaton are members of BEAMA - British Electrotechnical and Allied Manufacturers Association, where Mr Dingle is now leading a project group which works on the infrastructure for electric vehicles.
00, 0000
Charging with no wires
Wireless charging for electric cars seems like quite an attractive idea, but technologies providing such a possibility are far from perfect. Oleg Kononenko, Chief Development Officer at Ecomotors LLC, shares his perspective in this matter.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine