07 Декабря 2019 | суббота | 00:35
Energoterra

Новости

Декабря 05, 2019
TVEL and Kozloduy NPP have contracted supplies of Russian nuclear fuel to Bulgaria through 2025
TVEL JSC and Kozloduy NPP have signed contractual documents for supplies of Russian nuclear fuel to the Bulgarian nuclear power plant for the period up to and including 2025.
Декабря 04, 2019
TVEL completes the contract for supply of fuel pellets to India for Tarapur NPP
TVEL JSC has shipped to India the final consignment of uranium fuel pellets for BWR reactors and thereby fulfilled the relevant contract with the Department of Atomic Energy of the Government of India. The total volume of the supplied fuel pellets exceeded 50 tons, all shipments have carried out in 2019.
Декабря 03, 2019
Enel Green Power has started operations at its new 220 MW Magdalena II solar facility in Mexico
Magdalena II is Tlaxcala’s first renewable project, and EGP’s first project in Mexico to sell its entire electricity output, expected to total around 640 GWh per year, to private offtakers on the country’s Wholesale Electricity Market.

Аналитика

Октября 19, 2017
Impact of Amazonian hydropower is “significantly underestimated”, study finds
The environmental impact of hydropower generation in the Amazon may be greater than predicted, according to new University of Stirling research.
Июня 15, 2017
DNV GL invites wind industry to Joint Industry Project to optimize wind farm operations
Hamburg, Germany – 15 June 2017, DNV GL announces its latest Joint Industry Project (JIP), aiming to optimize the performance of wind farms by reducing the downtime and lower the costs of energy during the operational project life span of 25 years or more.
Июня 08, 2017
The two-millionth ton of oil accepted into the CPC system from Russian fields on the Caspian Sea shelf
On June 8, 2017, the two-millionth ton of oil was accepted from Lukoil at the Komsomolsk pump station of Caspian Pipeline Consortium (CPC) in the Republic of Kalmykia into the CPC system. Since the beginning of 2017, Lukoil has delivered about 1.3 million tons of oil into the CPC system.

Интервью

00, 0000
The route of oil
Currently, main challenges of Transneft JSC include such tasks as integrated improvement of the system of main oil and product pipelines to meet the requirements of oil production and treatment and to ensure effective oil transportation both domestically and abroad; establishment of the infrastructural basis for a flexible and competitive market of oil and oil products; organization of new ways for oil reception. At EnergyLand’s request, the Vice-President of Transneft JSC Mikhail Barkov is telling about the company’s projects.
00, 0000
Electric vehicles conquer Europe
Phil Dingle, head of Eaton Power Utilities and Networks, shared his views on the prospects of the infrastructure for electric vehicles with the EnergyLand.info magazine. Eaton are members of BEAMA - British Electrotechnical and Allied Manufacturers Association, where Mr Dingle is now leading a project group which works on the infrastructure for electric vehicles.
00, 0000
Charging with no wires
Wireless charging for electric cars seems like quite an attractive idea, but technologies providing such a possibility are far from perfect. Oleg Kononenko, Chief Development Officer at Ecomotors LLC, shares his perspective in this matter.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine