17 Февраля 2020 | понедельник | 10:57
Energoterra

Новости

Февраля 06, 2020
Enel X 696 MW of demand response (DR) capacity awarded to Enel X for delivery year 2024 in the Polish Capacity Market
This capacity increases by 28% Enel X’s DR portfolio, which maintains a 70% share in the DR segment of Poland’s Capacity Market
Января 30, 2020
Rotork actuators used for precise oil and gas flow control on Brazilian FPSO vessel
Electric and fluid power actuators from Rotork have been installed on a new Floating Production Storage and Offloading (FPSO) vessel in Brazil.
Января 30, 2020
Molecule modification could improve reprocessing of spent nuclear fuel
​The reprocessing of spent nuclear fuel could become safer and more efficient in future after researchers found a way to modify the structure of molecules to remove radioactive materials.

Аналитика

Января 16, 2020
Rosatomflot summed up 2019 operations results
FSUE Atomflot (an enterprise of ROSATOM) summed up results of its operations in 2019. Over this time, nuclear icebreakers steered 510 vessels of a total gross tonnage of 30.28 million tons (for comparison, in 2018, 331 vessels of a total gross tonnage of 12.7 million tons were steered).
Января 15, 2020
NOVATEK reported today preliminary operating data for the twelve months ended 31 December 2019
In 2019, NOVATEK’s hydrocarbon production totaled 590.1 million barrels of oil equivalent (boe), including 74.70 billion cubic meters (bcm) of natural gas and 12,148 thousand tons of liquids (gas condensate and crude oil), resulting in an increase in total hydrocarbons produced by 41.0 million boe, or by 7.5% as compared with the twelve months 2018.
Декабря 30, 2019
Package of documents signed for Russian gas transit across Ukraine to continue beyond 2019
Pursuant to the Protocol of December 20, 2019, Gazprom, Naftogaz of Ukraine, Gas Transmission System Operator of Ukraine and the Ministry of Justice of Ukraine signed a package of documents providing for Russian gas transit across Ukraine to continue beyond December 31, 2019.

Интервью

00, 0000
The route of oil
Currently, main challenges of Transneft JSC include such tasks as integrated improvement of the system of main oil and product pipelines to meet the requirements of oil production and treatment and to ensure effective oil transportation both domestically and abroad; establishment of the infrastructural basis for a flexible and competitive market of oil and oil products; organization of new ways for oil reception. At EnergyLand’s request, the Vice-President of Transneft JSC Mikhail Barkov is telling about the company’s projects.
00, 0000
Electric vehicles conquer Europe
Phil Dingle, head of Eaton Power Utilities and Networks, shared his views on the prospects of the infrastructure for electric vehicles with the EnergyLand.info magazine. Eaton are members of BEAMA - British Electrotechnical and Allied Manufacturers Association, where Mr Dingle is now leading a project group which works on the infrastructure for electric vehicles.
00, 0000
Charging with no wires
Wireless charging for electric cars seems like quite an attractive idea, but technologies providing such a possibility are far from perfect. Oleg Kononenko, Chief Development Officer at Ecomotors LLC, shares his perspective in this matter.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine