17 Июля 2019 | среда | 00:31
Energoterra

Новости

Июля 11, 2019
NOVATEK and Atomenergomash Sign Memorandum on Localizing Fabrication of LNG Equipment
NOVATEK and JSC Atomenergomash, a Mechanical Engineering Division of the Rosatom State Corporation, signed a Memorandum on Strategic Partnership and Localizing the Fabrication of Critical Equipment for LNG Production.
Июля 10, 2019
Annual Maintenance Works of Nord Stream Pipeline Scheduled for July 2019
From 16 July to 30 July 2019, Nord Stream AG will temporarily shut down both lines of its gas pipeline system for routine maintenance works. The maintenance shutdown is part of the pipeline’s annual inspection cycle and will take place for the seventh time.
Июля 06, 2019
Naftogaz reports on progress of unbundling
Naftogaz of Ukraine presented its fourth quarterly report and held an expert discussion on the unbundling of the independent Ukrainian gas transmission system operator (TSO).

Аналитика

Октября 19, 2017
Impact of Amazonian hydropower is “significantly underestimated”, study finds
The environmental impact of hydropower generation in the Amazon may be greater than predicted, according to new University of Stirling research.
Июня 15, 2017
DNV GL invites wind industry to Joint Industry Project to optimize wind farm operations
Hamburg, Germany – 15 June 2017, DNV GL announces its latest Joint Industry Project (JIP), aiming to optimize the performance of wind farms by reducing the downtime and lower the costs of energy during the operational project life span of 25 years or more.
Июня 08, 2017
The two-millionth ton of oil accepted into the CPC system from Russian fields on the Caspian Sea shelf
On June 8, 2017, the two-millionth ton of oil was accepted from Lukoil at the Komsomolsk pump station of Caspian Pipeline Consortium (CPC) in the Republic of Kalmykia into the CPC system. Since the beginning of 2017, Lukoil has delivered about 1.3 million tons of oil into the CPC system.

Интервью

00, 0000
The route of oil
Currently, main challenges of Transneft JSC include such tasks as integrated improvement of the system of main oil and product pipelines to meet the requirements of oil production and treatment and to ensure effective oil transportation both domestically and abroad; establishment of the infrastructural basis for a flexible and competitive market of oil and oil products; organization of new ways for oil reception. At EnergyLand’s request, the Vice-President of Transneft JSC Mikhail Barkov is telling about the company’s projects.
00, 0000
Electric vehicles conquer Europe
Phil Dingle, head of Eaton Power Utilities and Networks, shared his views on the prospects of the infrastructure for electric vehicles with the EnergyLand.info magazine. Eaton are members of BEAMA - British Electrotechnical and Allied Manufacturers Association, where Mr Dingle is now leading a project group which works on the infrastructure for electric vehicles.
00, 0000
Charging with no wires
Wireless charging for electric cars seems like quite an attractive idea, but technologies providing such a possibility are far from perfect. Oleg Kononenko, Chief Development Officer at Ecomotors LLC, shares his perspective in this matter.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine