17 Января 2019 | четверг | 17:06
Energoterra

Новости

Января 17, 2019
The first stage of the reconstruction of the Yubileinaya compressor station is over
«Stroygazmontazh» has completed the first stage of the reconstruction of compressor shop No. 4, CS-16 Yubileinaya. The customer is Gazprom Tsentrremont, the contractor is Krasnodargazstroy.
Января 16, 2019
Rosneft Deutschland successfully started direct marketing operations
Rosneft Deutschland GmbH, a Rosneft subsidiary, started direct marketing operations in order to increase the efficiency.
Января 14, 2019
Gazprom Export Successfully Concludes a Balance-of-Month Gas Sales Deal on the Electronic Sales Platform
On January 10, 2019, within the trade session, Gazprom Export LLC successfully concluded the first gas sales deal on the balance-of-month basis at the Gaspool point.

Аналитика

Октября 19, 2017
Impact of Amazonian hydropower is “significantly underestimated”, study finds
The environmental impact of hydropower generation in the Amazon may be greater than predicted, according to new University of Stirling research.
Июня 15, 2017
DNV GL invites wind industry to Joint Industry Project to optimize wind farm operations
Hamburg, Germany – 15 June 2017, DNV GL announces its latest Joint Industry Project (JIP), aiming to optimize the performance of wind farms by reducing the downtime and lower the costs of energy during the operational project life span of 25 years or more.
Июня 08, 2017
The two-millionth ton of oil accepted into the CPC system from Russian fields on the Caspian Sea shelf
On June 8, 2017, the two-millionth ton of oil was accepted from Lukoil at the Komsomolsk pump station of Caspian Pipeline Consortium (CPC) in the Republic of Kalmykia into the CPC system. Since the beginning of 2017, Lukoil has delivered about 1.3 million tons of oil into the CPC system.

Интервью

00, 0000
The route of oil
Currently, main challenges of Transneft JSC include such tasks as integrated improvement of the system of main oil and product pipelines to meet the requirements of oil production and treatment and to ensure effective oil transportation both domestically and abroad; establishment of the infrastructural basis for a flexible and competitive market of oil and oil products; organization of new ways for oil reception. At EnergyLand’s request, the Vice-President of Transneft JSC Mikhail Barkov is telling about the company’s projects.
00, 0000
Electric vehicles conquer Europe
Phil Dingle, head of Eaton Power Utilities and Networks, shared his views on the prospects of the infrastructure for electric vehicles with the EnergyLand.info magazine. Eaton are members of BEAMA - British Electrotechnical and Allied Manufacturers Association, where Mr Dingle is now leading a project group which works on the infrastructure for electric vehicles.
00, 0000
Charging with no wires
Wireless charging for electric cars seems like quite an attractive idea, but technologies providing such a possibility are far from perfect. Oleg Kononenko, Chief Development Officer at Ecomotors LLC, shares his perspective in this matter.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine