04 Октября 2022 | вторник | 17:35
Energoterra

Новости

Октября 03, 2022
EBRD promotes green production at Tashkent Pipe Plant
The European Bank for Reconstruction and Development (EBRD) is promoting energy efficiency in Uzbekistan’s steel production sector by supporting operations of the country’s leading private producer of prefabricated steel products Tashkent Pipe Plant (TPP).
Сентября 30, 2022
Vestas would launch an onshore wind turbine tower with a hub height of 199 meters
Danish firm Vestas said it was launching an onshore wind turbine tower with a hub height measuring 199 meters (just under 653 feet), in the latest example of how the sector is turning to increasingly large structures.
Сентября 29, 2022
Meetings of CPC Corporate Governance Bodies
A Meeting of the Board of Directors of Caspian Pipeline Consortium-R JSC and an Extraordinary General Meeting of the Shareholders of Caspian Pipeline Consortium-K were held in Baku on 27-28 September 2022.

Аналитика

Мая 16, 2020
Nuclear Techniques Support Crop Production on Salt-affected Soils in Middle East
Salinization – the increasing amount of salt content in soil – contributes to land degradation, desertification and subsequently food insecurity. In the Middle East, the main constraint on agricultural development of arid and semi-arid land is limited water availability, making agricultural production difficult.
Января 16, 2020
Rosatomflot summed up 2019 operations results
FSUE Atomflot (an enterprise of ROSATOM) summed up results of its operations in 2019. Over this time, nuclear icebreakers steered 510 vessels of a total gross tonnage of 30.28 million tons (for comparison, in 2018, 331 vessels of a total gross tonnage of 12.7 million tons were steered).
Января 15, 2020
NOVATEK reported today preliminary operating data for the twelve months ended 31 December 2019
In 2019, NOVATEK’s hydrocarbon production totaled 590.1 million barrels of oil equivalent (boe), including 74.70 billion cubic meters (bcm) of natural gas and 12,148 thousand tons of liquids (gas condensate and crude oil), resulting in an increase in total hydrocarbons produced by 41.0 million boe, or by 7.5% as compared with the twelve months 2018.

Интервью

00, 0000
The route of oil
Currently, main challenges of Transneft JSC include such tasks as integrated improvement of the system of main oil and product pipelines to meet the requirements of oil production and treatment and to ensure effective oil transportation both domestically and abroad; establishment of the infrastructural basis for a flexible and competitive market of oil and oil products; organization of new ways for oil reception. At EnergyLand’s request, the Vice-President of Transneft JSC Mikhail Barkov is telling about the company’s projects.
00, 0000
Electric vehicles conquer Europe
Phil Dingle, head of Eaton Power Utilities and Networks, shared his views on the prospects of the infrastructure for electric vehicles with the EnergyLand.info magazine. Eaton are members of BEAMA - British Electrotechnical and Allied Manufacturers Association, where Mr Dingle is now leading a project group which works on the infrastructure for electric vehicles.
00, 0000
Charging with no wires
Wireless charging for electric cars seems like quite an attractive idea, but technologies providing such a possibility are far from perfect. Oleg Kononenko, Chief Development Officer at Ecomotors LLC, shares his perspective in this matter.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine