25 Июня 2018 | понедельник | 05:30
Energoterra

Новости

Июня 24, 2018
NOVATEK Signed MOU with KOGAS
NOVATEK’s Chairman of Management Board Leonid Mikhelson noted: "The Asian Pacific markets are a priority destination for our LNG projects as this important geographical region represents the fastest growing markets for natural gas consumption, and South Korea is presently one of the largest importers of LNG.”
Июня 22, 2018
Rosneft holds Annual General Meeting of Shareholders
Rosneft’s Annual General Shareholders Meeting was held in Krasnoyarsk on June 21. Holders of 92.54% of the Company’s shares took part in the meeting.
Июня 19, 2018
Gazprom Neft Moscow Refinery completes installation of large-scale equipment for its cutting-edge Euro+ oil refining unit
Eighty nine percent of works on the construction of the Euro+ combined oil refining unit (CORU) at the Gapzrom Neft Moscow Refinery are now complete, including installation of all large-scale equipment.

Аналитика

Октября 19, 2017
Impact of Amazonian hydropower is “significantly underestimated”, study finds
The environmental impact of hydropower generation in the Amazon may be greater than predicted, according to new University of Stirling research.
Июня 15, 2017
DNV GL invites wind industry to Joint Industry Project to optimize wind farm operations
Hamburg, Germany – 15 June 2017, DNV GL announces its latest Joint Industry Project (JIP), aiming to optimize the performance of wind farms by reducing the downtime and lower the costs of energy during the operational project life span of 25 years or more.
Июня 08, 2017
The two-millionth ton of oil accepted into the CPC system from Russian fields on the Caspian Sea shelf
On June 8, 2017, the two-millionth ton of oil was accepted from Lukoil at the Komsomolsk pump station of Caspian Pipeline Consortium (CPC) in the Republic of Kalmykia into the CPC system. Since the beginning of 2017, Lukoil has delivered about 1.3 million tons of oil into the CPC system.

Интервью

00, 0000
The route of oil
Currently, main challenges of Transneft JSC include such tasks as integrated improvement of the system of main oil and product pipelines to meet the requirements of oil production and treatment and to ensure effective oil transportation both domestically and abroad; establishment of the infrastructural basis for a flexible and competitive market of oil and oil products; organization of new ways for oil reception. At EnergyLand’s request, the Vice-President of Transneft JSC Mikhail Barkov is telling about the company’s projects.
00, 0000
Electric vehicles conquer Europe
Phil Dingle, head of Eaton Power Utilities and Networks, shared his views on the prospects of the infrastructure for electric vehicles with the EnergyLand.info magazine. Eaton are members of BEAMA - British Electrotechnical and Allied Manufacturers Association, where Mr Dingle is now leading a project group which works on the infrastructure for electric vehicles.
00, 0000
Charging with no wires
Wireless charging for electric cars seems like quite an attractive idea, but technologies providing such a possibility are far from perfect. Oleg Kononenko, Chief Development Officer at Ecomotors LLC, shares his perspective in this matter.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine