03 Февраля 2025 | понедельник | 07:10
Energoterra

Komsomolets colliery of SUEK-Kuzbass adopts conveyor type coal hauling

Сентября 04, 2013

A new high-performance longwall (No.1732) launched at SUEK-Kuzbass' Komsomolets Colliery. The longwall is 300 m long, its reserves are 1.4 mln tonnes of coal.

The minable thickness of the Breyevsky seam is 2.3 m.  The coal is removed by a mechanized system consisting of 108 roof supports Tagor 15/32 (Poland) and 66 roof supports Glinik15/32 (Poland), a 4LS-20 shearer, an "Anzhera 34" longwall conveyor, a PSP-308 stage loader.  The planned monthly workload for the new longwall is 200,000 tonnes.

The peculiarity of the longwall is its coal-hauling system. For the first time in the colliery's 80-year history the coal is hauled from the working face to the skip shaft using conveyor type transport.  The colliery quit using electrically driven haulage tubs having received a modern 2 km conveyor chain featuring a 1,200 mm belt.

Another novelty in the Company is using a polymer mesh in the disassembly room for the seam that thick, thus providing quality and safety of disassembling. 

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine