03 Февраля 2025 | понедельник | 18:45
Energoterra

Turboatom manufactured a runner for HPP Turial (India)

Октября 11, 2013

In October 2013 the specialists of OJSC "Turboatom" produced and passed under the shipment the second runner of hydro turbine RO 75-B-265 for under construction HPP Turial.

The equipment has passed a static balance and ready for shipment.

According to the contract for 3 Francis turbines with unit capacity 32.6 MW HPP Turial OJSC "Turboatom" will produce runners with 13 blades, diameter - 2,65 meters and weighing 12 tonnes each. The company also will produce a set of mobile devices and adjustments . Previously, the plant implemented a model tests , which are one of the conditions of the contract.

The nominal capacity of the plant after the completion of construction will be 93 MW, head 53 m, and the frequency of rotation of each unit - 230,8 revolutions per minute.

Факты из архива:
Сибирская генерирующая компания примет участие во Всемирном дне охраны труда

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine