In particular, Shaturskaya GRES increased generation by 2.4%, Smolenskaya GRES - by 3.3%. Positive dynamics of the plant performance indicators in 2013 was due to the changes in the energy system generation structure and weather conditions. Generation of Surgutskaya GRES-2, Yaivinskaya GRES and Berezovskaya GRES was conditioned by mode and balance situations in the regions and correspondingly, by capacities load by Regional Dispatching Offices of the System Operator, as well as water content changes in Siberia.
Телевидение на солнечных батареях