02 Июня 2025 | понедельник | 04:22
Energoterra

Belorusneft sold the billionth kW*h of electricity, generated in-house

Февраля 24, 2014

This indicator was achieved in January, 2014.

The history has been tracked since December, 2006 from the moment of commissioning of the first energy generating facility (co-generation plant of the Belarusian Gas Processing Plant) and due to subsequent commissioning of two more block-plants (gas turbine cogeneration plant Ostashkovichi and cogeneration plant Davydovka). The total capacity of the generating plants is 31.16 MW.

Electricity was supplied to the networks of the Gomelenergo.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine