06 Февраля 2025 | четверг | 21:41
Energoterra

FRUNZE for field «South Kemachi»

Мая 08, 2014

PJSC «Sumy Frunze NPO» will supply turbo-compressor trains of several models to Uzbek oil – gas condensate field «South Kemachi», where new booster compressor station is currently under construction.

According to the Contract the experts of Sumy Frunze Plant shall design, manufacture and ship 4 turbo-compressors (TKA): 2x8 MW and 2x18 MW in very tight terms. TKA, as to the order, to be of modular design.

Considering that natural gas produced at this field contains aggressive contaminants, engineering departments of the Company design advanced type of compressors to complete turbo-compressors trains. In particular, the compressors will be made of corrosion-resistant materials.

Shipment is scheduled at the end of October 2014.

By now Sumy Frunze engineers hadn’t references at field «South Kemachi», which is located in Bukharo-Khivinsk oil and gas region of Uzbekistan.

См. также:
Курс на энергосбережение: что надо поменять
Правило Legrand: современный офис – это эффективное освещение каждого квадратного метра
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine