High-pressure rotor was mounted and put into operation after repair in January 2013.
At present, the turbine unit has reached design capacity 100 MW. Earlier, the maximum load was no more than 75 MW and was limited to a vibration condition of the turbogenerator.
According to Fa-Lai TPP, the Vietnamese party is completely satisfied with the turbine unit operation.
Энергоэффективность в промышленности: быть или не быть