16 Апреля 2024 | вторник | 23:25
Energoterra

Turboatom has completed the manufacture of equipment for Zaramagskaya HPP-1

Октября 16, 2014

OJSC "Turboatom" has completed the manufacture of spherical pre-turbine gate valve for Zaramagskaya HPP-1 (North Ossetia, Russia).

In October 2014 the equipment was packed and shipped to the plant. Previously valves have successfully passed the hydraulic, functional and strength tests, whereof a related act was signed.

Under the contract signed in December 2010 for Zaramagskaya HPP-1 "Turboatom" has produced two spherical pre-turbine gate valves with the diameter of 2 m with a dynamic head of 760 m and static head of 635 m for Pelton turbines. In addition, the enterprise has carried out the design and delivery, as well as it will perform installation supervision and commissioning.

См. также:
«Газпром» на треть сократил поставки газа Венгрии
 

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine