22 Января 2025 | среда | 15:49
Energoterra

Cogeneration plant is being erected on the natural gas in Belorusneft-Osobino

Октября 23, 2014

Specialized construction department of Belorusneft is the general contractor.

The foundation has already been laid down, the operations are being carried out to erect the walls of central heat points, scaffold bridge is being mounted under the heat pipeline of preinsulated pipes.

Carcassing of reinforced concrete columns and metalwork of the primary building is at the final stage.

Upon commissioning new energy source will ensure significant cost reduction of Belorusneft-Osobino related to electric and heat energy.
 

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine