22 Января 2025 | среда | 03:00
Energoterra

Yangpur oil company started construction of the pipeline

Ноября 25, 2014

The pipeline has been designed for useful utilization of associated gas.

The pipeline will be laid up to the booster pipeline pumping station of Izvestinskoe oil deposit up to gas refining company SIBUR, via the pipeline the gas will be led straight to the factory. Implementation of such project will enable Yangpur NK OJSC, Belorusneft Russian enterprise to bolster profit margins.  Earlier on the by-product of oil production was flared which had a negative impact on the environment problems.

Preparatory actions have been started to lay the pipeline. It will be laid down along 21 km of rough territory – deep-frozen soils, tundra and marshland. It is expected that gas pipeline of booster pipeline pumping station of Izvestinskoe deposit – Gubkinsk gas refining plant will be commissioned in the spring of the coming year.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine