20 Января 2025 | понедельник | 23:53
Energoterra

“Turboatom” renew stock of machine-tools by own forces

Декабря 26, 2014

At OJSC “Turboatom” additional manufacturing capacities that were not in use over 15 years were put into operation. In 2014 Engendering-Technical and Repair Services of enterprise by own forces implemented upgrade of 8 units of equipment.

“Equipment that long time was in inactive state was out into operation. This way we solve the bottleneck problem in four main workshops. Subsequently this will help us to reduce number of interplant transfers, reduce cycles and steady distribute manufacturing tasks”, - informed Chief Engineer Grigoriy Ischenko.

Main part of works is – repair of mechanical and electrical part of machine-tools, adjusting of software, erection and commissioning. “In priority for enterprise were marry-go-round machines and we put into operation 5 marry-go-round machines with diameter form 1.5 up to 4 m. Also our subdivision implemented overhauling of radial drilling, boring and planer milling machines”, – said Deputy Chief Engineer on Operation of Equipment Nicolay Degtyar.

Thus hydroturbine workshop No 83 received two new machine-tools, steam turbine workshop No 53 – three machine-tools, workshop of assemblage and testing No 73 – two machine-tools and workshop of machining process and welding No 72 – one machine-tool.

OJSC “Turboatom” plan to continue technical re-equipment by own forces, in the sequel. Particularly, in first quarter of 2015 planned activation of two upgraded machine-tools in hydroturbine and foundry workshops Nos. 83 and 50.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine