In March 2015 enterprise shipped guide vanes of distributor, pipeline and electric wiring. Next turbine head cover will be shipped and also shaft, runner, screen of ring valve and other mechanisms of turbine unit.
Nowadays, at Power Plant with participation of supervision of erection specialists of “Turboatom” implementing concreting of spiral chamber and assemblage of bottom ring of distributor at erection site.
Under contract concluded in April 2013 OJSC "Turboatom" manufacture and supply full set of equipment for reversible hydraulic machine ОРО170-В-730 Dnestrovskaya HPSPP. Enterprise also implements supervision of erection, commissioning and testing. Maximum capacity of Unit in turbine mode is 390 MW, in pump mode – 420 MW.