During acceptance testing of equipment geometry sizes were checked. Next shaft with weight 33 t, length 6,5 m and diameter 3 m will be packed and provided for shipment. To the end of April at plant planned to manufacture servomotors, oil head and other parts of turbine. Finish work on the second hydrounit planned in the first half of 2015.
Under contract concluded in July 2011 OJSC "Turboatom" implement rehabilitation of three hydroturbine with adjustable blades of Kremenchug HPP, with rated capacity 58 MW with change of runner with diameter 8 m, hydroturbine shafts, guide vanes and bearings. As result of executed works capacity of every unit will increase up to 64 MW.
Also increase life-time and overhaul life of equipment.