The work was contracted by LLC Gazprom Transgaz Krasnodar. The license for the work was acquired by the Rostov firm after a tender conducted in July 2014.
The water abstraction installation has been in operation since 1996. Water from the borehole supplies an industrial facility — a gas flow measurement station located at the 375 km point of the Kamensk-Shakhtinsky line pipe operation center. Evaluation of the groundwater reserves at the site had not been carried out throughout its years of operation.
In the course of their work, Yuzhgeologia specialists determined the exact hydrogeological conditions at the water abstraction site, the parameters of the target water horizon, and the quality of water, and they have carried out an evaluation of the Category B water reserves.
The water-bearing materials at the target aquifer system are the fractured sandstone and sandy shales lying at 10.3m-14m depth and 34.5m-47m depth respectively. The quality of the water puts it in the freshwater category, its key indicators corresponding to the regulatory requirements SanPin 2.1.4.1074-01 “Potable water”. However, the water from the borehole is used only for industrial purposes at the LLC Gazprom Transgaz Krasnodar facility.
The materials from the evaluation of the site have undergone state validation. The final report has been submitted to the client.