28 Ноября 2024 | четверг | 13:45
Energoterra

HMS Group to supply block cluster pumping station for Srednebotuobinsk Field

Октября 02, 2015

HMS Neftemash (HMS Group) was awarded the contract for supply of the block cluster pumping station for Srednebotuobinsk oil and gas condensate field (Taas-Yuriakh Neftegazodobycha) according to tender results.

The cluster pumping station is intended for water injection into productive layers during formation pressure maintenance operations and equipped with five centrifugal multistage pumps of CNS type with 240 m³/h capacity and 1422 m pressure head.

The station consists of highly prefabricated process and electrical skid modules for short transportation and installation time. Automatic control system ensures operation of the equipment without continuous presence of personnel.

HMS Neftemash (HMS Group) is one of the largest manufacturers of the skid-mounted pumping equipment in Russia and the CIS. The company successfully supplied over 25 block cluster pumping stations for the leading oil & gas companies in Russia within 2011-2015.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine