27 Ноября 2024 | среда | 19:37
Energoterra

Turboatom tested and presented to customer governing system for Slavyansk TPP

Января 03, 2016

Specialists of PJSC "Turboatom" manufactured and presented to customer equipment for Unit No 6 Slavyansk TPP (Ukraine).

There was performed control assemblage of governing system of turbine K-330-23,5 on test bench. In presence of customer equipment passed control assemblage and complex tests, appropriate certificate was signed according to its results. Next, governing system will be dismantled, packed and provided for shipment.

Final stage of works under contract will be control assemblage of high, medium and low pressure cylinders with rotors. Currently, on test bench assemblage of turbine is continuing, after this equipment will be tested and provided to customer.

Under conditions of contract signed in June 2014 PJSC "Turboatom" developed design, project and technical documentation, as well as manufacture and supply two steam turbines K-330-23,5 in full set for reconstruction of Unit No 6 Slavyansk TPP. In addition, plant will supply auxiliary equipment and spare parts. Obligations of enterprise also include supervision of erection and field supervision.

Preparatory work for reconstruction of inactive Unit No 6 Slavyansk TPP implement since August 2013. Unit will be divided into two Units with capacity 330 MW each.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine