25 Апреля 2024 | четверг | 15:13
Energoterra

Gazprom Neft drills first ever quadruple multilateral well

Января 12, 2018

Gazprom Neft subsidiary Gazpromneft-Yamal has completed construction of Russia’s first ever multilateral well with four horizontal cased-hole side tracks, at its Novoportovskoye field.

A total 6,756 metres was drilled, including 4,411 metres drilled in the target strata. The well was constructed in 39 days at a rate of 5.78 days per 1,000 metres.

Drilling horizontally branched wells facilitates a manifold increase in drainage from disjointed low-permeability strata, significantly increasing the oil recovery factor at productive strata and bringing marginal reserves into development without the need to drill additional wells. Russian-produced equipment was used in well construction, retooled in line with the specific geological conditions of the Novoportovskoye field.

 

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine