This is the first well to be drilled in the contract area. The well is planned to reach total depth of up to 2,424 metres, which is expected to take around two and a half months. The well data then will be analysed and, if successful, an evaluation programme may be conducted to confirm the results.
bp is operator and holds a 50% interest in the SWAP production sharing agreement (PSA) with partner SOCAR holding a 50% interest.
Rovnag Abdullayev, president of SOCAR, said: “It is gratifying that after the modernization of the KazMunayGas’ Satti jack-up floating drilling rig by SOCAR's CDC, the first drilling works have started in the Shallow Water Absheron Peninsula. This demonstrates the recent development of cooperation between companies of the countries of the Caspian region. I am confident that SOCAR, bp Azerbaijan and Kazakhstan's KazMunayGas will continue to cooperate successfully on projects in the Caspian Sea.”
Gary Jones, bp’s regional president for Azerbaijan, Georgia and Turkey, said: “We are excited to commence the drilling operations in the SWAP area. A great deal of preparation has been made to assure a safe and robust drilling programme using our experience and advanced technology solutions from other shallow water areas around the world. We look forward to working closely with SOCAR to deliver safely and efficiently this first exploration well ever drilled in the SWAP area.”
The Satti jack-up rig is operated by the Caspian Drilling Company (CDC). The rig was contracted for the SWAP project in June 2021.