23 Ноября 2024 | суббота | 20:20
Energoterra

The Second Nord Stream 2 String Is Being Filled with Natural Gas

Декабря 18, 2021

As of December 17, the gas-in procedure for the second string of the Nord Stream 2 pipeline has started. Like the first string, the second string will be gradually filled with gas to build the required inventory and pressure.

Pre-commissioning activities on the second string were completed successfully to assure the pipeline integrity.
 
Nord Stream 2 will inform about further technical steps in due time.
 
The pipeline is built and independently certified according to applicable technical and industry standards to ensure reliable and safe operations.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine