Within the agreement it is planned to carry out complex repair works of the equipment at more than 50 substations as well as overhead transmission lines on the territory of Noyabrsk Electric Mains operation.
The planned maintenance work will increase equipment operational life, prevent possible blackouts caused by equipment malfunction and will improve overall operation of regional electric power system.