The proposals are a part of Program for integrated development of new hydrocarbon fuel fields in Yamalo-Nenetsky region and in the North of Krasnoyarsky Krai through 2020. In this Program, the principle Customer is RF Ministry of Power Engineering, and the General Contractor is Siberian Scientific Analytical Center (SibNATs).
The proposals are based on the current state of electric power engineering in Yamalo-Nenetsky Region and in the North of Krasnoyarsky Krai and on estimates of future power demand.
Energosetproekt has a data base for this region including documentation related to external power supply network for Vankor fields. This helped to prepare the proposal within a short timeframe. The quality of works performed by our specialists was highly appreciated by General Contractor.
At the meeting held in RF Ministry of Power Engineering, Energosetproekt submitted its version of power engineering development which was preliminary accepted.
The Program of integrated development of YaNAO and the northern part of Krasnoyarskyi Krai through 2020 has been reviewed by RF State Duma and after subsequent debates will be submitted to Russian Government and President.