The daily production of the well will total 30 tons of oil. Besides, “Oil Rocks” Sea Drilling Office has started drilling of the well No 2426 from the platform No 2415. The project depth of the well drilled to X Horizon makes 1980 meters. According to geologists, after the well is put into operation, the daily production will amount to 12 tons of oil. Both of the wells will be put into operation by “Oil Rocks” Oil and Gas Extraction Office.