BP confirmed that following detailed discussion with the National
Incident Commander, Admiral Thad Allen, it will continue to provide live
video feeds from the seabed throughout the planned ‘top kill’ procedure
– the attempt to stop the flow from the damaged MC252 well by pumping
heavy drilling fluids into it.
Throughout the extended top kill procedure – which may take up to two days to complete - very significant changes in the appearance of the flows at the seabed may be expected. These will not provide a reliable indicator of the overall progress, or success or failure, of the top kill operation as a whole. BP will report on the progress of the operation as appropriate and on its outcome when complete.