08 Мая 2024 | среда | 16:11
Energoterra

”Orsknefteorgsintez” continues to implement equipment upgrading program

Июля 01, 2010

“Orsknefteorgsintez”, a subsidiary of NK “RussNeft”, continues to implement equipment upgrading program. Within its frames the company drawed more than 15 million rub. in 5 months in 2010.

To enhance fire protection of bitumen pouring loading track stationary water fire monitors were installed and plugged in to high pressure water pipelines.
At catalytic reforming units an absorber was changed as well as 22 ventilation sets, 5 waste heat exchanger lockers, casing head, transformers and other facilities and the installation of interior arrangement was fulfilled.
Тhe abovementioned new equipment implementation corresponds to the latest efficient production requirements and would assist to improve such issues  as  safety increasing of  technological processes, ensure the reliability of technological processes and labor conditions improvement.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine