27 Апреля 2024 | суббота | 16:52
Energoterra

"Turboatom": for Kievskaya HPP No 19 (Ukraine) was tested and dispatched runner of hydro turbine

Июля 15, 2010

For Russian concern "Rosenergoatom" (updating of turbine K-500-65/3000) was manufactured and dispatched 4 stages of blades of the 4th stage and four stages of blades of the 5th stage.

For HPP La Yeska (Mexico) were manufactured and dispatched the shaft of the first hydro turbine, the blades of wicket gate of the second turbine, details of wicket gate and also spare parts and mechanisms of the second hydro set. It was also manufactured and dispatched to the customer the shaft of the second turbine.
For Egorlikskaya HPP-2 (Russia) were manufactured and dispatched runner with the shaft of the fourth hydro turbine, the order is closed in production.
For Kanevskaya HPP No 8 (Ukraine) was dispatched wicket gate of hydro turbine, the order is completely closed in production.
For Dnepro HPP-2 No 2 (Ukraine) were dispatched lower and regulating ring of wicket gate of hydro set.
For Kremenchugskaya HPP (Ukraine), Reftinskaya NPP (Russia), TPP Paroshen (Romania) and other customers were manufactured and dispatched power spare parts in the sum of about 4 Million hryvnas.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine