26 Ноября 2024 | вторник | 10:34
Energoterra

Two new wells commissioned at “Pirallahi” field

Августа 10, 2010

The well No 1061 at “Pirallahi” field has been commissioned recently.

The daily output of the well drilled to Girmaki Suite by “Absheron” Drilling Works Office of SOCAR Complex Drilling Works Trust makes 4 tons of oil from the depth of 670 meters. Other well No 1059 drilled to Girmaki Suite by “Absheron” Drilling Works Office has been put into operation recently as well. The daily output of the well makes 4 tons from the depth of 700 meters. Both of the wells will be commissioned by “Absheron” OGPD.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine