27 Ноября 2024 | среда | 07:58
Energoterra

Two wells drilled at “Gunashli” field

Сентября 25, 2010

SOCAR-AQS has completed drilling works of the well No 80 drilled from the platform No 13 and the well No 56 from the platform No 11 at “Gunashli” field.

The digging of the well No 56 drilled to Qala-2 Suite made up 3750 meters and the project depth of the well No 80 made up 4100 meters. SOCAR-AQS will soon complete the drilling works of the well No 312 from the platform No 13. The wells will be put into operation by “28 May” OGPD.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine