27 Ноября 2024 | среда | 09:46
Energoterra

HMS Group participates in supply Adler power station with pumps

Сентября 28, 2010

Hydromashservice, joint trading company of HMS Group, has signed the 39 m RUB contract with Mosenergo to supply pumps to the Adler power station (Sochi) which is under construction.

The contract conditions specify the delivery of the pumps in a number of parties in 2010-2011.
All equipment supplied to the object should comply with strictest requirements to withstand 9 degrees on Richter scale and operate under noise level of  80 dB.
The Adler power station will consist of two blocs with joint power 360 MW. The construction of the station is conducted in the preparation for 2014 Sochi Winter Olympics.
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine