The contract conditions specify the delivery of the pumps in a number of parties in 2010-2011.
All equipment supplied to the object should comply with strictest requirements to withstand 9 degrees on Richter scale and operate under noise level of 80 dB.
The Adler power station will consist of two blocs with joint power 360 MW. The construction of the station is conducted in the preparation for 2014 Sochi Winter Olympics.