In accordance with terms of the Contract two transformers TRDN-63000/110 will be manufactured for S/S «Tavriya» (Simferopol region), and one transformer TRDN-80000/110 for S/S «Okhotnikovo» (Saksiy region).
Solar power plants being under construction in the Crimea will be among the most powerful ones in Europe. This was mentioned by Viktor Yanukovich, the President of Ukraine, at meeting of the Committee on economic reforms. The President emphasized that start-up of power plants that employ alternative energy sources, wind and sun in particular, is an important measure within the scope of implementation of national projects, aiming at economic development of Ukraine and execution of large-scale reforms. Construction of number of substations is scheduled in connection with building of solar power plants in AR Crimea and in Odessa.
Total amount of Contract constitutes UAH 30,5mln. Terms of delivery are undertime – 90 calendar days, dispatch is scheduled for December, 2010. At present time design documentation is being worked out at ZTR.