At Kiev HPP is implemented updating of horizontal bulb (-type) hydro turbine with installation of new runner and wicket gate.
Specialists of OJSC "Turboatom" made new adjustable-blade runner with diameter 6 m with renewal blade system and equipped the wicket gate with new blades with better form. After reconstruction the capacity of hydro set will increase from 19, 2 MW to 21 MW, COE will increase to 4% and also will increase ecological safety and lifetime of the turbine.
In OJSC “Turboatom” plans is to manufacture equipment for the set No 20.