LLC “SGM” has won the tender put out by OJSC “Gazprom” for the right to conclude the general contractor contract for construction and installation works at the sections of “Pochinki – Yaroslavl, 250.1 km – 267.5 km” and “Pochinki – Yaroslavl, 446.5 km – 463.4 km” as part of “Pochinki – Gryazovetz” pipeline construction.
The construction is carried out for the needs of CJSC “Yamalzaginvest”.
Its full length will amount to approximately 650 km, with diameter of 1420 mm and operating pressure of 7.4 MPa. The pipeline will include up to 6 compressor stations with total capacity of 580 MW.