For instance, 28 May OGPD takes significant steps in this direction. Recently the well №266 drilled from the platform #14 and well #235 from the platform #15 have been put into commission after total overhaul.
At present, production of the well №266 makes 60 tons of oil and well №235 – 50 tons of oil per day. The repair works have been conducted by wells’ major workover shop of 28 May OGPD.