29 Ноября 2024 | пятница | 22:35
Energoterra

“Spetsgazremstroy” has supplied gas to Altai

Января 31, 2011

OJSC “Spetsgazremstroy”, entering the SGM Group of companies has completed construction of the second construction stage of inter village gas pipelines in the Republic of Altai. The construction investor is – LLC “Gazprom mezhregiongaz”, the employer – is OJSC “Regiongazholding”.

OJSC “Spetsgazremstroy” constructed 53 km of the inert village gas pipeline (the 2nd construction stage) up to the town of Gorno-Altaisk and 15,1 km of gas distribution pipeline (the 2nd construction stage) up to the village of Maim in the Republic of Altai.
Currently OJSC “Spetsgazremstroy” is continuing works for construction of high pressure gas pipeline of the gas distribution plant in the village of Borzovaya Zaimka of the Central region of the Altai territory. Its length amounts to 6,6 km.
Gasification of eastern regions of Russia will change population life quality, will give momentum to development of industrial production. Utilization of natural gas will allow to improve the ecological situation, what is especially important for intensive development of Altai as a resort zone.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine