02 Декабря 2024 | понедельник | 07:19
Energoterra

Preparation has begun at the Shakhrinav-1P well for lowering the first protection string

Февраля 09, 2011

Preparation has begun at the Shakhrinav-1P well for lowering the first protection string Gazprom zarubezhneftegaz has started penetration for the lowering of the first protection string in the Shakhrinav-1P well (36 kilometres south-west of Dushanbe).

The protection string is one of the important elements of the construction of the well, which serves to overlay the bed when the subsoil has a difficult texture and allows further unimpeded drilling.
Penetration is carried out by using an automatic system for supporting the vertical trajectory of the shaft, called Verti Trak™.
The Verti Trak™ automatic system, used for the construction of vertical wells, allows full control of the driling process under difficult geological conditions.
This technology is used to receive information about the drilling trajectory and angle of deflection from the vertical in real time. Digital downhole electronics automatically regulate the angel of inclination and level out the direction of the well shaft.
In addition, the Verti Trak™ system allows optimal loading at the drill bore head, which accelerates the drilling process significantly.
This is the first time that a vertical shaft support system has been used in Tajikistan.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine