30 Ноября 2024 | суббота | 13:45
Energoterra

Varyoganneftegaz pursues energy efficiency program

Февраля 24, 2011

A 3-year program for the improvement of energy efficiency has been developed in Varyoganneftegaz (TNK-BP’s subsidiary). The core action to take place includes water shut off jobs, reduction of inefficient injection, improvements of heat-and-power engineering, reductions of power consumption and reengineering of infrastructure.

The action is expected to help the company save about RUR 120 mln in 2011.
In 2010 a total of seven pilots took place in Varyoganneftegaz to shut off the formation water. The search for technologies to achieve no-nonsense savings of power in the course of treatment and pumping of produced water is going to go on. The plans for this year include 40 jobs and tests of 5 technologies to take place.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine