Engineer, started the design work of two Francis turbines of unit capacity of 51 MW with the impeller diameter 3,1 m and two disk hydro valves with diameter of 4 m for Gotsatlinskoy HPP. Preparing to test the model turbines, after which the plant will begin manufacturing the equipment.
Contract to supply equipment for the plant was signed in February this year.