19 Января 2025 | воскресенье | 20:44
Energoterra

"Turboatom" the beginning of the design of equipment for HPP Gotsatlinskoy

Марта 14, 2011

Specialists of OJSC "Turboatom" transgressed the design of equipment for HPP Gotsatlinskoy, built on the river Avarsk Coys in Dagestan.

Engineer, started the design work of two Francis turbines of unit capacity of 51 MW with the impeller diameter 3,1 m and two disk hydro valves with diameter of 4 m for Gotsatlinskoy HPP. Preparing to test the model turbines, after which the plant will begin manufacturing the equipment.
Contract to supply equipment for the plant was signed in February this year.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine