The gas pipeline branch will be constructed to improve the gas supply to the populated areas, industrial and agricultural companies of Tambov region.
The length of the gas pipeline will be 36.8 km, the pipe diameter – 325 mm, the pressure – 5.4 MPa.
The gas pipeline path will go through Tokarevskiy and Zherdevskiy areas of Tambov region as well as Ternovskiy area of Voronezh region. The gas pipeline will cross six motorways, the design also provides for three river crossing by horizontal directional drilling under the rivers Kleshnya, Savala and Talovaya.