The equipment will be installed at the second phase of Urengoiskaya CS where reconstruction is being made at present time. By means of compressors of FRUNZE production the customer is planning to increase station performance capability operating under low pressure of native gas at field.
JSC «Sumy Frunze NPO» performed such works for LLC «Gazprom dobycha Urengoi». In 2008 Sumy Frunze took part in re-equipment of the first phase of «Urengoiskaya» CS.
JSC «Gazprom» has been cooperating with Sumy Frunze for a long time and is one of the largest customers of Sumy Frunze products. At latest Sumy Frunze has manufactured products for equipping «Gryazovetskaya», «Novoyubileinaya», «Mikunskaya», «Zapolyarnaya» compressor stations.