22 Января 2025 | среда | 11:10
Energoterra

NLMK Group’s VIZ-Stal signs contract for transformer (grain-oriented) steel production equipment

Июня 08, 2011

VIZ-Stal has signed a contract for LOI (Germany) to supply and supervise the assembly of equipment for the revamping of its Electric Insulation Coating Line (EICL-8).

The upgrade of the Strip Finishing Line is a major step towards setting up a process flow for mastering the production of a new product – high permeability steel; it will also improve thin-gage product surface quality and boost GO steel competitiveness in the global market.  
EICL-8 will be the first line at VIZ-Stal’s Cold Rolling Shop with natural gas strip heating in place of electrical heating.  It will reduce energy consumption by 30%. The line’s performance will improve significantly with yields increasing more than 1.5-fold.
The overall cost of the project is expected to be approximately RUR1.1 billion. Startup of the revamped EICL-8 is scheduled for 2013.

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine