They were said that special place for 3,000 m3 land store meeting environmental requirements had been arranged at the territory of oil production and transportation facility of Bahar Energy contract area to collect, process and utilize stratal waters extracted together with oil. After the store is put into operation discharge of water into the adjacent ponds will be stopped and the ponds will be dried up. The store is going to be commissioned in September. Also the information was given about preparation of Ecological Policy of Absheron Operation Company. According to the Policy, oil production field of the company contract area meets all ecological requirements.