30 Января 2025 | четверг | 21:55
Energoterra

TNK-BP Presents Tender Documentation for Construction of Yamal Oil Pipeline System to Contractors

Августа 31, 2012

CJSC Rospan International (a member of TNK-BP Group of Companies) has issued tender documentation for the construction of the “Yamal” oil pipeline system.

With a total length of around 374 km, the pipeline will enable transportation of oil from fields in Yamal-Nenets Autonomous District and northern Krasnoyarsk Kray.

The project involves the comprehensive capital construction of the “Yamal Oil Pipeline System: Suzun –Tagul – Russkoe – Zapolyarnoye metering station”.

For long-distance transportation of oil the line pipe will be built alongside the route facilities and a metering station (Zapolyarnoye) in the vicinity of Transneft’s oil pumping station # 2. The work will be carried out over three winter seasons: 2012/13, 2013/14 and 2014/15.
 

Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine