31 Января 2025 | пятница | 03:03
Energoterra

Mechel Reports Resumption of Coal Mining at New-Olzherassk Underground Mine

Сентября 21, 2012

Mechel announces that coal mining at Southern Kuzbass Coal Company OAO’s New-Olzherassk Underground has been resumed. Industrial reserves of coal at the mine’s long wall face 21-1-7 are 350,000 tonnes, with the mining face’s monthly load planned at 150,000 tonnes.

The mining face is equipped with the ZF mechanized complex, Chinese-made MG-400 cutter-loader, Russian-made Anzhera-34 face and rear conveyers, PSP 308 reloader and DU 910 crusher, which enables it to conduct mining using a high-efficiency technology for thick seam mining. The long wall face is also equipped with everything necessary to ensure industrial safety.

Mining at New-Olzherassk Underground were suspended on February 27, 2012, due to coal self-heating in the worked-out area of the long wall face 21-1-7.

 

Факты из архива:
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine