The mining face is equipped with the ZF mechanized complex, Chinese-made MG-400 cutter-loader, Russian-made Anzhera-34 face and rear conveyers, PSP 308 reloader and DU 910 crusher, which enables it to conduct mining using a high-efficiency technology for thick seam mining. The long wall face is also equipped with everything necessary to ensure industrial safety.
Mining at New-Olzherassk Underground were suspended on February 27, 2012, due to coal self-heating in the worked-out area of the long wall face 21-1-7.