19 Января 2025 | воскресенье | 18:28
|
НовостиPower Machines start supplying heat recovery boilers to Yakutskaya SDPP-2Февраля 14, 2015The first trucks with equipment for four horizontal heat recovery boilers have arrived at the construction site of Yakutskaya SDPP-2. Commercial talks on new contract with China advancing in good paceФевраля 14, 2015A meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Zhang Gaoli, First Vice Premier of the State Council of the People's Republic of China took place in Beijing. Power Machines renovate a hydropower unit at Charvakskaya HPP, UzbekistanФевраля 13, 2015Hydropower unit No. 2, renovated by Power Machines, has been commissioned at Charvakskaya HPP. Its capacity has increased by 15 MW, reaching 170 MW. Power Engineering Magazine announced Bushehr NPP in Iran as the Project of the YearФевраля 13, 2015Power Engineering, the oldest specialized energy journal (published in the USA since 1896) being the world most reputable professional media, announced the Projects of the Year 2014 awards. RusHydro paid coupons on series 07 and 08 bondsФевраля 13, 2015JSC RusHydro (ticker symbol: MOEX, LSE: HYDR; OTCQX: RSHYY) has paid coupons on series 07 and 08 bonds (state registration number 4-07-55038-E and 4-08-55038-Е of December 27, 2012). MSZ has been certified for compliance with the standard ISO 50001:2011Февраля 13, 2015JSC Machinostroitelny Zavod has been certified within the certification of ROSATOM’s Fuel Company TVEL for compliance with the international standard ISO 50001:2011 Energy management systems – Requirements with guidance for use. Rosneft Early Repays Part of a Loan Arranged for TNK-BP AcquisitionФевраля 12, 2015Rosneft announces it regularly repaid part of a loan obtained to finance the acquisition of TNK-BP. On February, 11 the Company paid to lenders USD 7.154 bln. Belorusneft specialists completed sidetracking operations in KaliningradФевраля 12, 2015According to the contract signed with the Russian company LUKOIL-Kaliningradmorneft, Belarusian specialists have drilled 3 wells: 103rd and 104th on Ushakovskoye and 3rd onWest Ushakovskoe fields. Polar crane tested at Novovoronezh IIФевраля 12, 2015Novovoronezh II is the lead project for the deployment of the AES-2006 design incorporating a Gidropress-designed pressurized water reactor, an evolutionary development from the VVER-1000. The Leningrad NPP: shortening of repairs will increase electricity production in 2015 by more than 13%Февраля 12, 2015Team of the Leningrad NPP will increase power generation by 13.63% to 26.6 billion kWh (planned by the FTS) and by 8.5% to 27.36 billion kWh (Corporate target key indicator) in 2015. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |