19 Января 2025 | воскресенье | 18:28
Energoterra

Новости

Power Machines start supplying heat recovery boilers to Yakutskaya SDPP-2

Февраля 14, 2015

The first trucks with equipment for four horizontal heat recovery boilers have arrived at the construction site of Yakutskaya SDPP-2.

Commercial talks on new contract with China advancing in good pace

Февраля 14, 2015

A meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Zhang Gaoli, First Vice Premier of the State Council of the People's Republic of China took place in Beijing.

Power Machines renovate a hydropower unit at Charvakskaya HPP, Uzbekistan

Февраля 13, 2015

Hydropower unit No. 2, renovated by Power Machines, has been commissioned at Charvakskaya HPP. Its capacity has increased by 15 MW, reaching 170 MW.

Power Engineering Magazine announced Bushehr NPP in Iran as the Project of the Year

Февраля 13, 2015

Power Engineering, the oldest specialized energy journal (published in the USA since 1896) being the world most reputable professional media, announced the Projects of the Year 2014 awards.

RusHydro paid coupons on series 07 and 08 bonds

Февраля 13, 2015

JSC RusHydro (ticker symbol: MOEX, LSE: HYDR; OTCQX: RSHYY) has paid coupons on series 07 and 08 bonds (state registration number 4-07-55038-E and 4-08-55038-Е of December 27, 2012).

MSZ has been certified for compliance with the standard ISO 50001:2011

Февраля 13, 2015

JSC Machinostroitelny Zavod has been certified within the certification of ROSATOM’s Fuel Company TVEL for compliance with the international standard ISO 50001:2011 Energy management systems – Requirements with guidance for use.

Rosneft Early Repays Part of a Loan Arranged for TNK-BP Acquisition

Февраля 12, 2015

Rosneft announces it regularly repaid part of a loan obtained to finance the acquisition of TNK-BP. On February, 11 the Company paid to lenders USD 7.154 bln.

Belorusneft specialists completed sidetracking operations in Kaliningrad

Февраля 12, 2015

According to the contract signed with the Russian company LUKOIL-Kaliningradmorneft, Belarusian specialists have drilled 3 wells: 103rd and 104th on Ushakovskoye and 3rd onWest Ushakovskoe fields.

Polar crane tested at Novovoronezh II

Февраля 12, 2015

Novovoronezh II is the lead project for the deployment of the AES-2006 design incorporating a Gidropress-designed pressurized water reactor, an evolutionary development from the VVER-1000.

The Leningrad NPP: shortening of repairs will increase electricity production in 2015 by more than 13%

Февраля 12, 2015

Team of the Leningrad NPP will increase power generation by 13.63% to 26.6 billion kWh (planned by the FTS) and by 8.5% to 27.36 billion kWh (Corporate target key indicator) in 2015.

1 . . . 249 250 251 252 253 254 255 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine