22 Января 2025 | среда | 07:32
Energoterra

Новости

Bolivia attracts around USD 1 billion in foreign investment in the first six months of the year

Ноября 18, 2014

A report by the Central Bank of Bolivia published in mid-October states that the country received USD 852 million in direct foreign investment over the first half of 2014.

Start of High Importance Stage in Project B1 – ISFSF Cold Trials

Ноября 18, 2014

State enterprise INPP starts the first stage of the acceptance for operation of Interim Spent Fuel Storage Facility (ISFSF, Project B1) which is cold trials.

South Stream’s offshore section poised for construction stage

Ноября 18, 2014

The Gazprom Management Committee addressed the progress with the South Stream gas pipeline construction project.

Rosneft and PDVSA Sign Second Long-Term Contract for Supplies of Oil and Oil Products

Ноября 17, 2014

A company of Rosneft group and PDVSA signed a long-term contract for supplies of oil and oil products of Venezuelan production. The document envisages the supplies of over 1.6 mln t of oil and 9 mln t of oil products to the group of Rosneft companies within 5 years.

Turboatom has manufactured hydraulic equipment for Novosibirskaya HPP

Ноября 17, 2014

OJSC "Turboatom" completed to produce the guide vane for Novosibirskaya HPP (station No. 5) factory No. 3. The equipment has been tested and is ready for shipment.

Rosneft and PDVSA cooperate in the realization of 5 JV in the upstream sphere in Venezuela

Ноября 17, 2014

November 17, Rosneft Head Igor Sechin held negotiations with the Vice-president for political issues, Minister of Foreign Affairs of Venezuela Rafael Ramirez in Moscow.

Third Oil Shipment from the Prirazlomnoye Field Delivered to Europe

Ноября 17, 2014

The Mikhail Ulyanov tanker has delivered the third shipment of Arctic oil (ARCO) produced at the Prirazlomnoye field to consumers in northwestern Europe. Crude shipments from the field totalled approximately 200,000 tonnes in 2014.

Revenue JSC TGC-1 under the RAS for 9 months of 2014 decreased by 4.8%

Ноября 17, 2014

JSC TGC-1 has published its financial report for the nine months of 2014 under the Russian Accounting Standards.

Gazprom Neft Moscow Refinery processes nine million tonnes of oil in first nine months of 2014

Ноября 15, 2014

The Gazprom Neft Moscow Refinery processed a total nine million tonnes of oil in the first nine months of 2014 — some seven percent more than the same period last year. Depth of refining stood at 72.5 percent.

Turkmenistan Delegation Visited TANECO

Ноября 14, 2014

A delegation of the Republic of Turkmenistan headed by Myratgeldy Meredov, Deputy Minister of Petroleum and Mineral Resources, paid a business visit to JSC TANECO on November 13.

1 . . . 293 294 295 296 297 298 299 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine